webrev:10/08/2009 04:44 PM
CHAPTER VII [PDF]
BUILDINGS, INFRASTRUCTURE AND LAND
Alternative Construction
Delivery Methods: Building Delivery Processes that vary from the more
standard Design-Bid-Build model. These may include Construction
Manager-At-Risk and Design-Build.
Architectural Program: The program is based on in-depth discussion with all identified building users and detailed analysis of standards and guidelines. It expands and redefines the facilities program to fully explain and document the following minimum requirements:
Required size, use, occupancy, and furnishing/equipment requirements of all spaces.
Required relationships of spaces to other spaces.
Required utility services for all spaces and investigations into available utilities.
Environmental requirements for all spaces.
Traffic/circulation requirements within and without the building. Building service requirements.
Tabulation of all net assignable areas.
Explanation of probable required non-assignable spaces.
Calculation of probable gross building area.
Code analysis.
Site analysis, including utilities, circulation, service, orientation, adjacent structures, etc.
Program cost
estimate.
Asbestos Abatement:
Programs to encapsulate or remove asbestos containing materials which,
if they become airborne or "friable", would constitute a health threat.
Backfill Plan: A plan for
how release space will be reoccupied, including an estimate of
associated costs and source of funds.
Building Renewal: Major
activities that involve the repair or reworking of a building and the
supporting infrastructure that will result in maintaining a building's
expected useful life. Building renewal does not include new building
additions, new infrastructure additions, landscaping and area
beautification, routine maintenance, or demolition and removal of a
building.
Capital Committee: A
committee composed of four or more Regents charged to provide
comprehensive review and approval of the capital development process,
where delegated by Board policy, including capital projects, real
property transactions, and financing activities.
Capital Development Plan
(CDP): A plan for identifying capital building projects that each
university intends to initiate during the following fiscal year,
including a fiscal management plan.
Capital Improvement Plan
(CIP) (Annual): Every year the universities are required to prepare a
Capital Improvement Plan that contains proposals for spending on land
acquisition, capital projects, energy systems, energy management systems
and building renewal. This CIP is to include a one-year plan and at
least a two-year forecast of proposed capital activity.
Capital Projects:
Buildings, structures, facilities, infrastructure and areas constructed,
renovated, or improved for the use or benefit of the Arizona Board of
Regents, the universities under its jurisdiction, and the State of
Arizona. (Major capital projects are those projects with a total project
cost of Two Million Dollars ($2,000,000) or greater.)
Construction Documents:
Those documents used for the solicitation of bids and the subsequent
construction of a project. These include the bidding documents, contract
forms, technical and general specifications, drawings, any addenda
issued during the bidding process and any approved change orders.
Debt Ratio: The numerator
of the debt ratio shall include fiscal year debt service on outstanding
and proposed bonds and certificates of participation, as shown in the
most recent capital improvement plan, and the denominator shall be comprised of
total projected expenses.
Deferred Maintenance:
Facility condition deficiencies identified through physical inspections
where deterioration and/or life safety concerns are evident and affect
the proper functioning of the facility. Typical building components with
deficiencies include: heating, ventilation and air conditioning, roofs,
flooring, walls, ceiling and lighting, electrical and plumbing. Deferred
maintenance does not include routine maintenance needs.
Demolition: The removal
of all or any part of a structure for any purpose.
Disabled Access: Refers
to making buildings and facilities accessible to individuals with
disabilities, consistent with the Americans with Disabilities Act,
through the elimination of architectural and communication barriers to
the extent those barriers prevent access to programs, services and
activities. Examples of modifications addressed to allow access by those
with mobility impairments may include, but are not limited to: doorways,
accessible paths of travel, restrooms, and seating areas. Other examples
are modifications to accommodate individuals with visual and hearing
impairments and may include, but are not limited to special signage,
telecommunications, emergency alarms, and elevator modifications.
Facilities Program: Identifies future space requirements using the Regents' Space Guidelines, and other relevant planning guidelines. The program considers facility use information, projections of future use, and other related characteristics. The program document shall include, at a minimum, the following:
An identification of
the total amount of space in terms of quality and quantity (count of
rooms and net assignable square feet by room type).
An estimate of net
assignable square feet by room type and total gross square feet.
Justification of
space needs.
Enrollment
activities, research projections, and/or other information, and how
these support facility and/or campus needs.
Reference to relevant
standards and guidelines from comparable institutions as appropriate
(e.g., Regents' Space Guidelines, CEFPI).
Discussion of
locational determinants for the facility and for the principal
elements within the facilities program.
Documentation of
special physical requirements which would influence project costs.
Other information necessary for the solicitation of architectural
and engineering services.
A preliminary total
project cost estimate based upon the above information.
Fiscal Management Plan: A
plan that identifies and justifies the source of funds, financing
instruments, term and approaches (e.g., lease-lease/back), annual debt
service, source of funds for debt service coverage, impact on tuition
and annual operations and maintenance costs (including source of funds)
for any capital project a university proposes to undertake. The plan
will also address the potential impact of the project on university debt
capacity and bonding authority (if applicable).
Fixed Equipment: Consists
of permanently affixed/installed furniture, fixtures and equipment.
Examples include but are not limited to: elevators, bulletin boards,
kitchen cabinets, environmental walk-in boxes, building directories,
library shelving, drinking fountains, signage, plumbing fixtures,
building mechanical systems, chalkboards, backbone telecom/data/systems
and electrical systems, fume hoods, fixed electronic equipment, and
fixed theater or classroom seating, as well as other fixtures and
equipment installed with the intent of permanent use in that location.
Furniture/Fixtures and
Equipment (FF&E): Moveable furniture, fixtures, or equipment that
requires no permanent connection to utilities or to the structure. They
may require utility outlets, but are plug-in types. Examples include but
are not limited to: moveable or non-fixed theater or classroom seating,
electronic equipment, desks, chairs, bookcases, files, waste
receptacles, easels, partitions, refrigerators, tables, credenzas,
stools, typing stands, computer stands and other furniture, including
interior wall/furniture systems. FF&E also includes scientific or
technical equipment such as autoclaves, centrifuges, lasers,
spectrometers, shop equipment/tools, kilns, and microscopes.
Infrastructure:
Nonbuilding improvements that directly support operating a facility that
is listed in the annual building system such as, but not limited to,
utility delivery systems, (e.g., steam and chilled water) roadway
systems, external lighting systems, irrigation systems, sidewalks and
parking lots. Additional campus infrastructure includes: campus grounds,
other circulation systems (bike paths, pedestrian routes, etc.), and
parking structures.
Land acquisition: The
procurement of real property by gift, grant, purchase, lease purchase,
condemnation or other lawful means.
Life Safety/Code
Upgrades: Those items specifically related to compliance with life
safety codes. Examples include but are not limited to: elimination of
dead-end corridors, improvement of building exits, installation of fire
sprinklers in existing construction, eliminating hazardous conditions,
etc.
Major Maintenance: The
periodic need to repair/rework building and infrastructure systems or
components. Examples include but are not limited to: reroofing,
disassembling and rebuilding air-conditioning system water chillers and
other long-term maintenance requirements.
Master Plan: A document
setting forth the concepts and guiding principles for future land use
and development of campus facilities and infrastructure.
New Construction: The
creation of a new facility or the addition, expansion, or extension of
an existing facility that adds to the building's overall gross square
footage. Examples include but are not limited to: additions to existing
facilities, construction of portable or temporary buildings, etc.
Release Space: Space
vacated in the existing inventory of campus buildings as a result of new
space being added to that inventory (e.g., new construction, lease,
etc.).
Renovation: The reworking
of an existing building or portion of an existing building, including
the upgrading of major systems, which extends the useful life.
Renovation includes the major replacement, or upgrading of building
systems, components, or fixed equipment that is necessitated by facility
obsolescence, change in use, ADA requirements, code requirements,
physical plant wear out, and/or related interior space modifications and
aesthetic improvements. Examples include but are not limited to:
demolition of the interior of a building or portion thereof including
the removal and subsequent replacement of electrical, plumbing, heating,
ventilating and air conditioning systems, fixed equipment, floor
coverings and interior walls and partitions (whether fixed or moveable).
The renovation of historic buildings that meet the evaluation criteria
listed in the National Register of Historic Places shall be performed in
accordance with the Secretary of the Interior's Standards for
Rehabilitation and Guidelines for Rehabilitating Historic Buildings and
in consultation with the State Historic Preservation Office.
Routine/Preventive
Maintenance: The recurring need to keep in good repair building and
infrastructure systems or components. Examples include but are not
limited to: replacement of cooler pads, air filters, light bulbs, drive
belts, lubrication, painting schedules, elevator maintenance, and other
required scheduled maintenance.
Shell Space: Building
space that has not been finished as part of the original construction
project. Examples include but are not limited to: unfinished areas of a
building such as floors and basements.
Sub-area Plan: A plan
representing a portion of the campus that is less than the area covered
by the Master Plan. Sub-area planning shall provide additional details
and the necessary information for implementing the concepts and
principles established by the Master Plan.
Total project cost: The full cost of a project that includes all direct construction costs (material, labor, site development, utilities, and infrastructure, extension, inflation adjustment, etc.) and indirect costs (land acquisition, architectural and engineering fees, furniture/fixtures & equipment, contingencies, etc.)
7-102 Overview of the Capital Development Process and Phases [PDF]
Description:
The capital development process is divided into seven phases: Master Plan, Capital Improvement Plan, Capital Development Plan Approval, Project Implementation Approval, Project Approval, Project Construction, and Project Closeout.
During the Master Planning Phase, the Capital Committee and the Board focus on the relationship between the university’s mission statement, strategic plan, and campus physical development plans.
During the Capital Improvement Plan (CIP) phase, the Capital Committee and the Board focus on the existing condition, utilization and expenditure of capital resources at each of the universities. The CIP includes a report on the university’s land and leasing activities, building renewal needs, and deferred maintenance activities. In each report, the universities identify proposed capital projects for the coming fiscal year and forecast capital projects that may begin in the subsequent two fiscal years.
During the Capital Development Plan Approval phase the Capital Committee and the Board focus on the strategic planning perspective for proposed capital projects for the coming fiscal year. The university identifies potential capital projects that contribute to the attainment of the university mission statement and strategic plan, justifies the project need, and presents preliminary total cost implications for the university and the state. Capital Development Plan Approval allows the university to proceed to the Project Implementation Approval phase.
During the Project Implementation Approval phase the university defines elements of the project scope, schedule and budget and proceeds with completion of schematic design. Project Implementation Approval allows the university to proceed to the Project Approval phase.
During the Project Approval phase the university completes the design and prepares construction documents. The Project Approval document serves as notification that the project is ready to advertise for bids, or acceptance of the final guaranteed maximum price, and enter the Project Construction phase.
During the Project Construction phase the university awards contracts, and constructs the project in accordance with ABOR Policy 3-804, (Professional Services and Construction Services Procurement).
During the Project Closeout phase the university obtains substantial completion, completes building commissioning, final inspection, accepts and occupies the facility, and provides final payment to the consultants and contractors. The university performs a review and formal evaluation of the consultants' and contractors' performances.
Projects That Require Approval
All capital projects with an estimated total project cost of $5,000,000 or more shall be brought to the Capital Committee and the Board for approval regardless of funding source or financing structure. New construction and renovation projects with an estimated total project cost of $5,000,000 or more shall be submitted for Capital Development Plan Approval.
Projects that originally were not required to enter the capital development process, but subsequently are forecasted to exceed the dollar thresholds as described above, must be submitted for Capital Committee review and Board approval.
Capital projects where the Board and the university share with other entities (Federal, State, local, development groups, public/private ventures, etc.) the control, financing, or ownership (current or future) of the project and/or its delivery process and that are subject to review under Board policy 7-207, shall be reviewed by the Capital Committee and approved by the Board. The university shall seek guidance from the Central Office to document the proposed process for Board consideration. That process, at a minimum must include the following information, which may be provided in a single report or in a series of reports as details of the project are developed:
Notice to the Capital Committee of intent to pursue development of an eligible project, including proposed project scope and justification, as well as the process for providing a reasonable opportunity for competition.
Notice to the Capital Committee on development of negotiating parameters after the other entities have been identified or selected.
Submission for Capital Committee and Board consideration:
(1) Identification of
significant changes since capital development plan approval;
(2) Proposed project schedule’
(3) Project delivery method and process;
as well as project construction, maintenance and operational
standards;
(4) Fiscal impact and financing plans, and
other related information that includes, but is not limited
to, funding sources, debt payments, and estimated operation and maintenance costs, including
quality control measures that will protect university
interests in the areas of project financing;
(5) Project budget estimates and process used for developing
estimates, including the use of qualified professionals;
(6) Outline of other entities involved (if applicable)
including the equity position of other entities, anticipated
returns to other entities, and/or contributions of other
entities;
(7) Lease terms, including any ownership transition or
purchase options, and
(8) Description of other related projects including related
infrastructure improvements.
Project updates in the quarterly capital project status report.
Related Projects
The universities are responsible for defining the parameters (size, cost and discrete elements) of capital projects with the following provisions:
The parameters of a project shall not be defined with the objective to bypass or minimize the requirements set forth in Board policy.
The overall plans and costs for related and/or phased projects should be documented for consideration by the Capital Committee.
If the Board grants Capital Development Plan Approval for a group of related projects, Project Implementation Approval and Project Approval are necessary for any phase that exceeds $5,000,000. Projects within a project group shall share common attributes, such as location, project type, etc. Projects with no common attributes may not be bundled into one project group.
Description of Project Financing:
Universities must designate funding sources, including annual debt service if required to construct each project proposed in the Capital Development Plan. Notwithstanding this designation by the universities, the Capital Committee must review, and the Board must approve the specific issuance of bonds, lease-purchase agreements, certificates of participation, or any debt instrument regardless of total project cost.
Request for debt issuance approval may not occur prior to Project Implementation Approval. The universities must disclose fully the estimated costs of the project and the debt issuance, information on debt capacity, outstanding debt levels, and debt service payments.
Any capital project funded with debt may not increase the university’s debt ratio to more than eight percent (8%) for any year shown in the capital improvement plan.
The final maturity of any capital financing undertaken by a university will not exceed the estimated useful life of the capital asset being acquired or constructed.
In requesting authority for capital debt, each university shall provide written justification for the debt instrument requested that will include the assumptions made for the source of resources for the repayment of the debt, and the fiscal impact.
If projects require specific Legislative review:
The projects shall be presented to the Legislature, or its designated committee, for review anytime after receiving any necessary Project Approvals from the Capital Committee or the Board.
The projects shall have Legislative review prior to construction.
Both the request for Legislative review and the request to the Board for bond issuance shall display full disclosure of the estimated costs of the project, and if applicable, the bond issuance.
Use of bond authority for a project in excess of the amount initially approved by the Board and review by the Legislature will require Board approval prior to seeking review from the Legislature.
Total Project Cost Estimating:
The Regent's Construction Cost Control and Professional Fee Guidelines (Guidelines) shall be considered in developing cost estimates and calculating building replacement values. In addition, other industry cost guidelines or internal historical data may be used, including inflation factors to ensure the reasonableness of the cost estimates.
The Guidelines are published separately and contain fee schedules for architects/engineers, construction managers and contingencies; inflation factors; building and space specifications; and cost matrices for construction of exterior and interior spaces.
The Guidelines shall be reviewed and updated by an outside cost estimating consultant. Revisions shall be initiated by the Central Office and universities, and approved by the Executive Director.
Public Art for Major Capital Projects
Funds to provide public art may be budgeted for any major building to be constructed or renovated. Major buildings are those with total project costs of One Million Dollars ($1,000,000) or greater.
Funds will be for the purpose of placing, maintaining, repairing, removing or inventorying works of art (murals, frescoes, sculptures, fountains, mosaics, etc.) in or around university facilities.
The funded amount for public art shall not exceed one-half of one percent (0.5%) of the construction cost for any major building.
Building Design for persons with Disabilities: All new buildings and structures constructed or renovated at each institution shall comply with the provisions of The Arizonans with Disabilities Act of 1992, A.R.S. '41-1492 et seq., and any amendment thereof relating to making public buildings accessible and functional for the disabled.
Plaques For Buildings: Plaques installed on new buildings at each institution shall carry the names of the Governor and other Members of the Board in office at the time the construction contract was awarded, together with the President of the institution, the architect, the contractor, and other participants deemed appropriate.
Forms referenced in Chapter VII: Under the direction of the Executive Director, the Central Office and the universities have the responsibility to update and improve the various reports referenced in Board policy with the objective of presenting information to the Capital Committee and the Board in an effective format and manner.
7-103 Capital Committee Charter [PDF]
Purpose
To assist the Board in fulfilling its oversight and monitoring
responsibilities for the university system’s capital development and
real property activities by providing a more in-depth understanding of
each university’s planned use of existing capital resources, priorities
for capital construction, real property transactions, and the analysis
that supports each request relating to these activities.
Organization
The Capital Committee shall consist of the Chair of the Resources
Committee, the Chair of the Strategic Planning Committee, one or more
Regents appointed by the President of the Board, and the voting Student
Regent. One member of the committee shall be appointed by the President
of the Board to serve as Chair. Expert community members may be
appointed to and removed from the Capital Committee in accordance with
the Guidelines for Expert Community Members Serving on Board Committees.
Goals
The Capital Committee shall assist the Board in discharging its
system-wide oversight and monitoring responsibilities by:
Promoting a coordinated, efficient, and effective method of planning and utilizing existing capital resources.
Promoting an effective and continuously improving capital development process for achieving the university system’s goals and objectives.
Meeting
The Capital Committee shall adopt an annual calendar of meetings
consistent with the capital development process and required Board
approvals. The Capital Committee shall hold additional meetings, as
circumstances require.
Capital Committee Authority and Responsibilities
Authority and responsibilities of the Capital Committee shall include
the following:
Review and recommend possible changes or additions to the existing Board policy framework regarding the capital development process, real property activities, and financing transactions.
Act on the following from the Central Office:
Periodically review and revise the Capital Committee’s Charter as needed.
Monitor the university quarterly
construction progress reports.
Review the following from each university:
Strategic Plan update (annually),
Master Plan update (every five years),
Capital Improvement Plan (annually),
Capital Development Plan (annually),
Capital Development Plan revisions (when issued),
Project Implementation Approval requests,
Project Approval requests,
Request to purchase/sell/exchange real property
Requests to lease space,
Projects where the Board and the university share with other entities the control, financing or ownership of the project and/or its delivery process,
Debt-financing authority (bonding, lease-purchase, certificates of participation),
Intergovernmental Agreements relating to capital projects and real property activities, and
Space utilization report
(annually).
The Capital Committee shall have approval authority with respect to individual capital projects, real property transactions, and other matters as authorized by Board policy.
7-104 Strategic Planning [PDF]
Each year the Board shall review and, if necessary,
update systemwide strategic directions and action plan objectives.
Each year the universities shall review and, if
necessary, update their mission statements and strategic plans.
The Board shall review these updated mission statements
and strategic plans to ensure that they are consistent with systemwide
goals and reflect current priorities.
The universities shall, in consultation with the Central
Office, develop consistent minimum reporting requirements for university
strategic plans. Strategic plans shall identify major capital and
operating implications of key strategies, e.g., comprehensive plans,
sub-area plans. The Capital Committee shall review the portions of
university strategic plans relating to the implied or proposed capital
projects and operational impacts to the university’s master plan and
capital development plan.
Capital projects must contribute to specific strategic
objectives or satisfy other important criteria such as meeting life
safety requirements or correcting existing deficiencies.
University procedures for setting preliminary project priorities shall include processes to update mission statements and strategic plans, identify project proposals, and produce a preliminary project ranking.
Master Plans will be developed by the universities for main and branch campuses to guide their development.
Master Plans for other large parcels of university
land outside of the campus planning boundaries shall be developed.
Sub-area Plans within the campus planning boundaries
shall be developed as the universities deem necessary.
Master and Sub-area Plans should define the
direction, physical needs, land acquisition, and overall approach of
the university for a ten year timeframe. Campus physical development
plans should be based on the academic and research services the
institution intends to provide, on the student population it
projects to serve, and on the image the university leadership wishes
to project.
Master Plans shall be brought to the Capital Committee for review, and to the Board for approval.
The universities will maintain an ongoing planning process and conduct comprehensive plan reviews and updates at approximately five-year intervals.
Significant revisions or changes in concepts to
the approved Master Plans shall be presented to the Capital
Committee and the Board for review.
Significant revisions to a Plan are generally
defined as a change in use of a particular area other than
proposed in the most recent Board-approved Plan.
A university or campus that completes a Master Plan
is required to present the plan at that time. Presentation of the
plan would occur at the first of two Board meetings, with approval
being granted at the second.
Information shall be provided to the Capital
Committee and the Board regarding the public hearings and meetings
with the local community on the proposed Master Plan, if such
meetings have been deemed appropriate by the university. Major areas
of public concern should be explained as well as how the final Plan
addresses those concerns.
The Master Plan shall support the university=s
mission statement and strategic plan.
Sub-area Plans shall be brought to the Capital Committee for review, and to the Board for approval under the following circumstances:
Plans deviate from the guidelines established by the
approved Master Plan.
Plans pose a potential for identifiable impact on
the local municipalities and/or communities, either adjoining or
remote from campus boundaries. This impact shall be discussion as
appropriate.
Board approval of a Plan still requires specific
approvals of individual projects as outlined in this chapter of Board
policy.
Approval of specific design standards or architectural
guidelines which may be referenced in a Plan shall be delegated to the
university president after the Plan is approved.
In developing Master Plans and Sub-area Plans, the universities should take into consideration environmental impacts which may result from implementation of the Plan, and propose mitigation measures where appropriate.
7-106 Annual Capital Improvement Plans [PDF]
Each university will complete an annual Capital
Improvement Plan as required by state statute.
The annual Capital Improvement Plan serves three main functions:
To serve as a reference documents for current
facilities inventory and related financial management information;
To request general fund monies, including building
renewal, from the state; and
To identify capital projects the university intends
to implement during the next fiscal year along with a forecast of
proposed activities in the following two (2) fiscal years.
Process:
Guidance shall include, but not be limited to:
Limitations on the general fund request;
Systemwide prioritization of the general fund
request;
Requirements for necessary Board approvals or
requisite documents for project placement in the Annual Capital
Improvement Plans; and
Limitations on the amount of outstanding debt as
demonstrated by the debt capacity reports.
Each university will submit to the Board a fully developed Capital Improvement Plan in accordance with the calendar approved by the Chair of the Capital Committee. The Plan shall include the following elements:
All Funds Summary
Building Renewal Report
Deferred Maintenance Report
Building Inventory
Lease Report
Land Report
Capital Project Status Report
One-Year Capital Plan plus a Two-Year Forecast
Project Descriptions, Justifications, Scope and Budgets
Debt Capacity
7-107 Capital Development Plan [PDF]
Applicability: The Capital Development Plan Phase will
be used for those projects meeting the requirements as previously
defined in this chapter.
Schedule:
Each university shall submit an annual Capital
Development Plan for the upcoming fiscal year in accordance with the
calendar approved by the Executive Director. Capital Development
Plans are reviewed by the Capital Committee and approved by the
Board
Projects included in the Capital Development Plan
are generally carried forward from the previously approved Capital
Improvement Plan.
No capital project can go forward if it has not been
included in an approved Capital Development Plan.
A capital project need not be included in a Capital
Development Plan once it has received Project Approval.
If a project does not move forward for Project
Implementation Approval in the applicable fiscal year, it must be
resubmitted for inclusion in a subsequent Capital Development Plan.
The Capital Development Plan may be considered for
mid-year revisions in accordance with a calendar established by the
Executive Director. Revisions may include the addition of new
projects, project budget adjustments, and deletion of projects.
Phase Description:
Capital Development Plan Approval focuses on strategic planning perspective and shall be based on:
The mission, strategic plan, and master plan of
the university;
Advance planning such as the initial development
of a facility program and/or architectural program that
justifies the project; and
The preliminary total cost including sources and
uses of funds.
Each project submitted for Capital Development Plan Approval shall include a concise Project Justification Report to the Board. This Project Justification Report shall be developed in cooperation with the Central Office to ensure materials address the needs of the Capital Committee and the Board. The Project Justification report should justify the need for the project based upon the university's mission, strategic plan, and other supporting documentation. The Project Justification Report shall include the following information:
Project need
Programming and design costs, and exceptions (if
required), to achieve project implementation
Estimated project scope and cost, including
expected useful life of the project
Methodology used to develop the total project cost and comparison of cost to other similar previously approved projects established pursuant to Board policy 7-110 B.4 (Project Construction, University Procedures), including an explanation of significant cost differences from the comparable projects
Rationale for the selected project delivery method, including information on the selection process, the number of submittals received for each contracted activity of the delivery method, and any prior experience with selected entities
If applicable, rationale for seeking leadership in energy and environmental design (LEED) certification, including estimated costs for achieving certification
Conformance with space guidelines
Conformance with university missions, strategic
plans, campus master development plans, and plans for community
input
Fiscal Management Plan: How the universities
intend to fund the project, including annual debt service and
the impact to the fund sources that will pay the debt service,
as well as
annual operations and maintenance costs
Backfill Plan: The universities should identify
potential programs, functional uses, or non-use (e.g.,
demolition of a building) of the space that is released as a
result of the project
Alternatives to Project: Explain what alternatives to the project were investigated, and why they were not selected. These alternatives can include, but not be limited to:
(1) Whether the program could be accommodated in existing space (e.g., rescheduling, more efficient use of space)
(2) Whether the program could be accommodated in off-campus lease space
(3) Consider if the space could be constructed in partnership with the private sector
Description of other related projects including relating infrastructure improvements.
In preparing for the Capital Development Plan submittal, the universities are authorized to expend up to two percent (2%) of the preliminary total project cost for outside professional and consultant services, but no more than Two Hundred Fifty Thousand Dollars ($250,000). Expenditures for outside services may be included in the project budget.
Substantially completed Capital Development Plan Approval documents shall be submitted to the Central Office for review and comment no later than thirty (30) calendar days prior to the pertinent Capital Committee meeting. If the deadline is not met, the Chair of the Capital Committee shall have the option to withhold the documents for a subsequent Capital Committee meeting.
University Facility/Architectural Program Procedures
The universities will develop procedures to specify
the information requirements and process for programming the
facility.
A facilities/architectural programmer, who has
experience in translating users' needs into space, room, and
equipment requirements for similar facilities, should define the
space requirements.
A programming committee should be established and
structured to ensure that the specified program represents an
appropriate tradeoff between users' desires and a plan that
maximizes value to the university.
The program should include information specifying
space requirements, other program requirements, and special
requirements.
Authority Granted by Capital Development Plan Approval
Capital Development Plan Approval represents Board
approval of the project concept, scope, and preliminary total costs.
Capital Development Plan Approval authorizes the
universities to hire outside consultant services to initiate the
design, cost estimating, and/or alternative building delivery (i.e.,
construction manager-at-risk, design/build) processes through
schematic design.
In preparing for the Project Implementation Approval submittal, the universities are authorized to expend for outside professional and consultant services up to three percent (3%) of the estimated total project cost or Five Hundred Thousand Dollars ($500,000) whichever is greater. These expenditure limitations are in addition to those authorized for Capital Development Plan Approval submittal.
7-108 Project Implementation Approval [PDF]
Applicability: The Project Implementation Approval Phase
will be used for those projects meeting the requirements as previously
defined in this chapter.
Phase Description:
The Project Implementation Approval document shall include the following elements:
Prior Capital Committee and Board action
Project scope as identified in the schematic
design phase
Project justification elements from the Capital
Development Plan Approval
Project budget estimates prepared by qualified
professionals
Updated fiscal impact and Project Financing
Plan; other related project information that includes, but is
not limited to funding sources and estimated operation and
maintenance costs
Significant changes since Capital Development
Plan Approval;
Project schedule.
Substantially completed Project Implementation
Approval documents shall be submitted to the Central Office for
review and comment no later than twenty (20) calendar days prior to
the pertinent Capital Committee meeting. If the deadline is not met,
the Chair of the Capital Committee shall have the option to withhold
the documents for a subsequent Capital Committee meeting.
Project Implementation Approval requests for all
Capital Projects shall be submitted for Capital Committee review and
approval by the Board.
University Procedures:
Each university shall develop procedures to specify the required information and process for preparing the cost estimate for Project Implementation Approval. The procedures shall be designed to meet the following guidelines:
The construction manager and/or the design consultant shall normally prepare the project's estimate. A corroborating cost estimate must be obtained from an outside cost estimating or design consultant for all projects.
The estimates shall be reviewed and approved by in-house staff. An explanation in the Project Implementation Approval documents is required when the corroborating cost estimate differs from either the Regents' Construction Cost Control and Professional Fee Guidelines estimate or a separate estimate by five percent (5%) or more.
The universities shall develop and use a cost information database to record costs for capital projects.
Authority Granted by Project Implementation Approval:
Project Implementation Approval includes the authority to proceed with project financing and to contract for necessary consulting or other applicable services, and to complete the design, prepare construction documents and proceed to the Project Approval phase.
The university may transfer funds among expenditure categories in the total project budget without Board approval.
Revised Project Implementation Approval is required for increases in the estimated total project cost. The Capital Committee shall have authority for increases up to five percent (5%) of the total estimated project cost; increases greater than five percent (5%) shall be approved by the Board.
A project forfeits the authority granted by a Project Implementation Approval, and must be resubmitted for Board approval, if:
As a result of programming or other causes, the project requires reassigning or changing fifteen percent (15%) or more of the net assignable square feet, or
The project does not obtain Project Approval within twenty-four (24) months of being granted Project Implementation Approval.
Applicability: The Project Approval Phase will be used for those projects granted Project Implementation Approval by the Board.
Phase Description:
The purpose of the Project Approval phase is to allow for review of updated project information and data as the university initiates the bidding and construction process.
Project Approval shall include the following steps:
Information and data presented in the Project Implementation Approval document is revised where necessary.
Construction documents are near completion.
Bid advertising date is established for projects utilizing the design/build process; or a guaranteed maximum price has been obtained utilizing the design/build or construction-manager-at-risk process.
Information on the final total project cost estimate, including the independent cost verification process.
Project Approval documents are transmitted to the Central Office and reviewed with the university.
Level of Board Review
Projects with a total project cost between $5,000,000 and $20,000,000 may be granted project approval by the Capital Committee based upon the budget, schedule, scope, and other considerations as warranted. At the Committee’s discretion, any project approval request may be presented to the Board as circumstances warrant.
Projects with a total project cost greater than $20,000,000 should be reviewed by the Capital Committee and approved by the Board.
University Procedures:
If the project program has changed materially or the budget has increased by more than five percent (5%) of the estimated total project cost since the granting of Project Implementation Approval, the university must seek Capital Committee review and Board approval prior to advertising for bids.
If the project is on budget, schedule, and within scope, the university may advertise for bids prior to review by the Capital Committee but after submitting the Project Approval documents to the Central Office. This provision is provided for those situations where it can be demonstrated by the university that the accelerated schedule is likely to result in cost savings or advantages to the users. The university must include in the Project Approval documents a rationale for advertising for bids prior to Capital Committee review.
Authority Granted by Project Approval:
The university may advertise for bids and proceed to the Project Construction Phase.
Capital Committee approval is required for increases in total project cost that do not exceed five percent (5%) of the estimated total project cost.
A project forfeits the authority granted by Project Approval, and must be resubmitted for Capital Committee review and Board approval, if:
As a result of additive and deductive alternatives or other causes, the project requires reassigning or changing fifteen percent (15%) or more of the net assignable square feet, or
The total project cost increase is greater than five percent (5%) of the estimated total project cost.
The university does not initiate construction within twelve (12) months of bid opening
7-110 Project Construction [PDF]
Phase Description:
Universities select or continue with previously selected consultants.
Universities proceed with the bidding process, contractor selection, contract award and construction.
The universities may transfer funds among expenditure categories in the total project budget without Capital Committee or Board approval.
Capital Committee Approval is required for increases in total project cost up to five percent (5%) of the estimated total project cost.
Capital Committee review and Board approval are required for increases in total project cost greater than five percent (5%) of the estimated total project cost.
Quarterly project status reports are submitted to the Central Office.
University Procedures: The universities shall develop procedures as follows:
The selection of architect/engineers, construction managers, contractors, and selection of specialty consultants and the monitoring of construction shall be consistent with Board policies.
These procedures shall include controls to ensure that projects requiring Legislative approval obtain approval prior to commencing construction.
Project control procedures shall include university requirements for change orders, cost estimates, project reporting, and records management.
A cost information database shall be developed for completed projects to provide actual cost information for similar projects.
Phase Description:
The Project Closeout phase shall include following steps:
Universities inspect completed facilities. Certificate of Substantial Completion is issued. A list of incomplete and nonconforming tasks (punch list) is developed.
Once all incomplete and
nonconforming tasks have been
completed, the university may
issue final acceptance
documents.
Procedures shall be developed that:
Specify Project Closeout requirements to ensure that all required activities are performed before final payment is released to consultants and contractors
Formally evaluate the performance of all consultants and
contractors upon project completion
7-112 Capital Project Status Reports [PDF]
The Central Office shall monitor the capital development process and keep the Capital Committee advised on the status of major capital projects ($5,000,000 and greater).
A quarterly capital project status report shall be submitted by the universities to the Central Office.
Reports include all projects in process with total project costs of $100,000 and greater, with additional detail for those projects $2,000,000 and greater.
Reports shall have a separate section for projects between:
$100,000 and $1,999,999;
$2,000,000 and $4,999,999; and
$5,000,000 and greater.
Routine/preventive maintenance work should not be included in this report.
Reports shall be submitted within 45 calendar days following the end of the quarter.
For major capital projects that were substantially
completed during the quarter, a copy of the consultant=s Certificate of
Substantial Completion shall be included. After submission of the
certificate, projects shall be removed from the quarterly report.
7-113 Space Inventory and Utilization Reports [PDF]
The universities shall develop procedures and systems for providing space management information to:
Assist in planning potential capital projects based
upon space needs
Compare actual inventory and utilization data to the
Regents' Space Guidelines
Develop the estimated building replacement values.
Regents' Space Guidelines
The guidelines should be used for overall campus
facility planning and for planning new construction and renovation
projects.
The guidelines are intended to serve as overall
space guidelines, not as absolute standards.
The guidelines should be reviewed periodically by
the Central Office and universities, and revisions approved by the
Capital Committee.
Campus Space Committees
The universities shall establish broadly represented
campus space committees to stimulate discussions on improving the
use of campus space and facilities.
The committees should use the space inventory and
utilization reports, and other relevant documents, as the foundation
for its discussions.
The committees shall provide recommendations to
university executive management on improving the use of campus space
and facilities.
Reporting Requirements
Space inventory and utilization information shall be
completed and submitted to the Central Office and campus space
committees by May 1 of each year.
The reports shall be reviewed annually by the universities and Central Office for consistency and possible improvements.
Building renewal funds shall be calculated for every
eligible building by the universities each year utilizing the formula
approved by the Legislature's Joint Committee on Capital Review (A.R.S.
§41-793.01) and instructions from the Central Office. Each university
shall request from the Legislature, via the submission of the annual
Capital Improvement Plan, the total amount of building renewal
calculated.
The amount of funds generated by the building renewal
formula for each eligible building shall be included in the Building
Inventory Report which is incorporated into the annual Capital
Improvement Plan. The report also shall list the estimated deferred
maintenance for each building.
Building renewal may be used for projects as defined in
State statute (A.R.S. §41-790) or in session law. Consultant fees
related to Building Renewal Projects are an allowable use of building
renewal funds. State-appropriated building renewal monies may be
allocated for fixed equipment and interior wall/furniture systems with
the intent of permanent use in that location.
The Regents' Construction Cost Control and Professional Fee Guidelines are used to calculate the estimated replacement values for the building inventory report. Building replacement values along with building age are the primary variables in computing the state-appropriated building renewal request. The Central Office shall provide direction to the universities for calculating estimated building replacement value and building renewal.
7-115 Capital Project Audits: [PDF]
The Central Office shall audit capital projects,
including substantially completed projects, on a periodic basis for
compliance with Board policies.
The audits shall be performed by professionals with
relevant skills and shall focus on those areas most important to assess
system integrity.
The Central Office shall audit a sample of projects funded with state-appropriated building renewal monies. The audits shall take place no less than every two years, shall include each fiscal year appropriation and shall be consistent with the corresponding capital outlay bill.
7-202 Ownership and Procedures [PDF]
Real property utilized by the state universities shall be legally owned by or leased to the Arizona Board of Regents. Where deeds or leases have named a university as grantee or lessee, they shall be understood to mean the Arizona Board of Regents for and on behalf of such university. Each university is authorized to acquire, to dispose of, or to lease property under the conditions of this chapter, although the Board may alter the procedure or waive any requirement or other condition for any individual transaction upon application by a university. Prior Board approval shall be required only when specified herein, or when alteration or waiver is desired.
7-203 Purchase of Real Property [PDF]
Except as noted below, purchases of real property by a university require prior review by the Capital Committee and approval of the Board, and compliance with all requirements of this section not explicitly waived by the Board.
7-204 Sale of Real Property [PDF]
7-205 Exchanges of Real Property [PDF]
7-207 Leases of Real Property [PDF]
All lease agreements and amendments of lease agreements of real property, including lease agreements in connection with any development of capital projects, as defined in Board policy 7-102(B)(3) shall be reviewed by the Capital Committee and approved by the Board before becoming effective, except as provided below:
A university may enter into a lease or lease amendments as Landlord or Lessor without Board approval (except for use of athletic facilities by professional teams), provided all of the following criteria are met:
The lease term including all renewals shall not exceed 120 months;
The annual base lease amount does not exceed $500,000; and
The rental rate meets or exceeds the fair rental value of the property.
A university may enter into leases or lease amendments as tenant or lessee without Board approval provided all of the following criteria are met:
The original lease term shall not exceed a total of 60 months;
Renewal options in total shall not exceed an additional 60 months;
The total annual rental including tax, insurance and maintenance payable to, through, or on behalf of the landlord shall not exceed $500,000;
The rental rate does not exceed fair rental value; and
Funds are available.
A university shall report to the Capital Committee on its intent to solicit proposals for commercial development on university property, where the majority of the project’s business is anticipated to come from a non-university population, and involving a lease or lease amendments that will require review by the Capital Committee and approval by the Board pursuant to Subsection A. above. A university also shall report to the Capital Committee on negotiating parameters after a proposal has been selected. As applicable, reports may be provided in executive session.
All leases entered into shall be reported to the Central Office annually in accordance with procedures developed by the Executive Director.
7-208 Use of Athletic Facilities by Professional Teams [PDF]
Each university may authorize the use of university athletic facilities by professional teams. All such uses shall meet the following standards:
The rental rates for use of university facilities and properties by off-campus organizations shall be approved by the president of each institution. Rental rates should reflect considerations of the fair market value rates charged by comparable facilities, actual expenses incurred in providing the space (operations, maintenance, and deferred maintenance), and inflation. Each university shall review its established rates annually. A university may offer reduced rental rates to affiliated non-profit organizations.
7-210 Easements and Rights-of-Way [PDF]
7-211 Accepting Gifts of Real Property [PDF]
7-212 Naming of Buildings and Improvements [PDF]
Repealed
7-213 Small Group Student Housing [PDF]
The universities may, subject to approval by the Board, finance the construction of small group student housing projects, such as fraternity and sorority houses, through revenue bond issues on lands owned by the Board.
The facilities constructed under the terms of Subsection A may be leased for a term of forty (40) years or less to non-profit corporations organized by local alumni of the respective fraternities and sororities occupying the facilities. The rental rates shall include a down payment of an amount equal to the annual bond obligations on the portion of the aggregate bond issue apportioned to the particular project and monthly rental payments, in advance, of an amount equal to one-twelfth of the annual bond debt obligation.
A lease in default may be terminated by the institution upon the giving of thirty (30) days written notice to the lessee, which notice shall provide an opportunity to cure the default during the thirty (30) day period. The lease agreement may provide that any subsequent default within twelve (12) months following the initial notice may result in termination of the lease without the right to cure the default.
A lease shall provide that the lessee has an option to renew the lease for an additional term not exceeding forty (40) years, and an option to purchase the leased premises after the lapse of ten (10) years from the date of the lease, provided the full amount of the rent prescribed in the lease has been paid by the lessee for the entire term of the lease. The purchase price shall be based upon the fair value of the land exclusive of improvements. The rental for an additional term beyond the original forty (40) years, or the purchase price, shall be agreed upon by the Board and the lessee, or shall be determined by three (3) real estate appraisers, one to be selected by the Board, one by the lessee, and one by the president of the realtor's association of the city or town in which the institution is located.
In the event of the purchase of the property, the deed of conveyance granted by the Board shall contain a restriction limiting any subsequent conveyance of the property, the vesting of title therein, or the use thereof, to an incorporated grantee for the use of a student organization approved by the Board and in good standing at the institution.
Project facilities leased
shall be leased only for the use of those fraternities and sororities
that have no anti-integration clause in their constitutions or are in
the process of taking action to delete such clauses from their
constitutions.
webrev: 10/08/2009 04:44 PM